Site logo
Calendar IconTue, Jun 30, 2026
  • Home
  • All News
  • Crime & Security
  • Politics
  • Sports
  • FueledOil & Gas
  • Business
  • Education
  • MORE
    • Health
    • Agriculture
    • Entertainment
    • Regional
    • Features
    • Letters
    • Advertise
    • Trending
    • Video
  • facebook-black
  • instgram-black
  • tiktok-black
  • twitter-black
  • youtube-black
  • Home
  • Advertise
  • Get The App
  • Contact Us
Categories
  • All News
  • Sports
  • Crime & Security
  • Politics
  • FueledOil & Gas
  • Business
  • Education
  • Health
  • Agriculture
  • Regional
  • Features
  • Letters
  • Top Stories
  • Social
  • Classifieds
  • Culture
  • Entertainment
  • Environment
  • International
  • Top Story
  • Video
  • facebook-black
  • instgram-black
  • tiktok-black
  • twitter-black
  • youtube-black
Search Icon
Calendar IconTue, Jun 30, 2026
  • facebook-black
  • instgram-black
  • tiktok-black
  • twitter-black
  • youtube-black
  • HomeHome
  • TrendingTrending
  • VideoVideo
  • ContactContact Us
  • Home
  • Crime
  • MV Ma Lisha in drydock for 3-weeks vessel ‘slipping’ process

    MV Ma Lisha in drydock for 3-weeks vessel ‘slipping’ process

    Crime
    May 13, 2024
    MV Ma Lisha in drydock for 3-weeks vessel ‘slipping’ process
    The MV Ma Lisha (Photo: DPI/ April 23, 2023)
    FacebookTwitterPinterestEmailPrintWhatsAppRedditTelegramLinkedIn

    After one year of successful operation, the MV Ma Lisha will enter drydock for a period of three (3)  weeks from Monday May 13, 2024 to complete the administrative process of “Guarantee Slipping”,  so that the vessel can exit its defects liability period and the retained sum can be paid to its builders.

    This routine process is a part of the Ministry of Public Work’s contractual agreement with the Garden  Reach Shipbuilders Engineers Ltd (GRSE).

    Vessel “Slipping” involves lifting the ship from the sea along special rails, and then moving it to a  location where its surfaces can be viewed from various angles.

    According to the contract entered into with the Transport and Harbours Department and the GRSE:  Guarantee Slipping allows for all materials and fittings and all equipment upon the vessel to be fully  inspected and checked and for any issue that may have arisen during the first year of operation to be  rectified. This is to be completed at a date and place to be appointed by the Project Manager, which  shall be on or about the expiry of 12 months after the date of the Acceptance Certificate in respect of  that Vessel.

    Thus, as the MV Ma Lisha has crossed its one-year operation mark, this 3-week period has been  allocated to Guarantee Slipping.

    The MV MA Malisha

    The scope of the services to be carried out as part of Guarantee Slipping include but are not limited to: a) Renewal of the lubricating oil and replacement of the filters for the main engines and gearboxes  as per the manufacturer’s recommendations;

    1. b) Cleaning of all the engine air filters and changing the filter elements as necessary; c) Cleaning the coolers of the engines and renewing all zinc anodes if provided; d) Checking all the engines’ belts and adjusting if necessary;
    2. e) Checking tappet clearances for the inlet and exhaust valves, ignition timing and idle speed and adjusting if necessary;
    3. f) Conducting function tests for the engines’ protection system and their associated sensors, gauges and other measuring devices; and
    4. g) Any other work required or recommended by the engine manufacturer.

    The cost of the Guarantee Slipping is being borne by the GRSE and the works are being carried out at the  Guyana Port Inc. located at Supply, East Bank Demerara. A team from GRSE led by Commander Kartic,  the Project Manager, is in charge of coordinating the activities. The MV Ma Lisha will resume full service  at the end of this administrative period. In the interim, the MV Kimbia will ply the Georgetown to Kumaka

    Related Articles

    Recent Posts

    JUNE 2026
    MON
    TUE
    WED
    THU
    FRI
    SAT
    SUN
    1
    2
    3
    4
    5
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    25
    26
    27
    28
    29
    30

    Subscribe to News Room for email updates on the latest posts.

    By subscribing, you accepted Our Policy

    Site logo

    News Room is a news outlet launched in 2016 and caters to persons interested in creative and intelligent journalism with a broad perspective. We are a daily news broadcast on E-Networks channel, E1, and our stories are also distributed via the devices closest at hand: mobile phones and tablets.

    Quick links

    • Home
    • All News
    • Crime & Security
    • Politics
    • Health
    • Letters
    • Sports
    • Oil & Gas
    • Business
    • Education
    • Agriculture
    • Features
    • Entertainment
    • Regional
    • Advertise
    • Get The App
    • Contact Us
    • Trending

    © 2026 Copyrights by News Room. All Rights Reserved.

    • facebook-black
    • instgram-black
    • tiktok-black
    • twitter-black
    • youtube-black
    • Privacy Policy
    • Term & Conditions